Many sportswear projects become unnecessarily expensive before the first bulk garment is ever cut. The problem is often not the factory’s sewing ability or machinery; it is the gap between what a brand imagines and what a manufacturing team can actually measure, cost, sample, approve, and reproduce. A reference photo may communicate an aesthetic direction, but it does not tell a pattern maker the finished waist measurement, a fabric team the required composition and weight, or a production engineer whether a bonded edge, flatlock seam, or elastic application is essential to the design.
An OEM sportswear manufacturer typically needs clear product specifications, measurements, material requirements, construction details, branding artwork, expected quantities, size and color breakdowns, packaging requirements, target market information, and an approval process. A complete Tech Pack is ideal, but a reference garment, BOM, measurement chart, pattern, or approved specification set can also support project evaluation when its scope and limitations are clearly understood.
The easiest way to think about OEM development is to imagine that the product may eventually be repeated thousands of times by people who were not present in the original design meeting. Every detail left undefined still has to be decided by someone. If the brand does not define it, the factory must ask, propose, assume, or wait. The strongest projects therefore do not begin with the most impressive mood board. They begin with enough controlled information for both sides to make the same garment on purpose, then refine the details through disciplined sampling and approval.
What Should a Brand Provide First?

An OEM sportswear manufacturer needs enough information to understand the product, evaluate feasibility, estimate cost, and decide how sampling should begin. Ideally, the brand provides a Tech Pack, measurement chart, BOM, artwork, quantity plan, and reference sample. If some items are incomplete, the missing decisions should be identified clearly rather than left for the factory to guess.
What Does an OEM Project Brief Include?
A useful project brief explains the product in manufacturing terms, not just marketing language. “Women’s leggings” gives a factory almost no usable direction, while “high-rise training leggings with a double-layer waistband, side pockets, moderate compression, matte interlock fabric, and selected flat seams” already tells pattern, material, and sewing teams what kind of product they are evaluating. The brief should also identify intended activity, fit expectation, target market, approximate quantity, planned colors, size range, branding method, and whether the style is a new development or an existing product being transferred from another supplier.
The brief does not need to become a lengthy presentation. In fact, too much brand storytelling can hide the information that technical teams actually need. A concise project summary, combined with controlled technical files, is usually more valuable than ten pages of mood boards. The goal is to help the manufacturer distinguish what is fixed, what can be optimized, and what still needs a decision. That distinction affects the quotation, sample plan, material sourcing route, and the amount of engineering work required before the product can move toward bulk production.
Is a Tech Pack Required?
A complete Tech Pack is the strongest starting point for a mature OEM project because it converts a visual design into measurable instructions. Depending on the product, it may contain technical drawings, points of measure, size specifications, grading information, construction notes, seam details, fabric and trim requirements, colorways, branding artwork, labels, packaging requirements, tolerances, and a revision history. When those elements agree with each other, the manufacturer can cost and sample against a defined target rather than building a quotation around assumptions.
However, a perfect Tech Pack is not required merely to start a conversation. A physical sample, BOM, measurement chart, previous specification sheet, pattern, or annotated sketch can support an initial review. The practical distinction is between starting an evaluation and approving a product for repeatable manufacture. A factory may be able to discuss feasibility with incomplete data, but final costing and bulk execution need much tighter control. If material weight, measurements, seam type, logo process, or packaging remain open, those uncertainties should be listed explicitly so that the quotation reflects what is known and what still needs development.
Can a Reference Sample Be Used?
A physical reference garment can be extremely useful because it communicates proportion, construction order, fabric behavior, pocket position, seam placement, waistband structure, and hand feel in ways that drawings sometimes cannot. It is especially valuable when a brand is transferring an established style or wants a new factory to understand an existing fit. The sample becomes much more useful when the brand identifies exactly what it controls: fit, construction, fabric hand feel, or only general visual direction.
The safest method is to separate the reference into “keep,” “change,” and “reference only.” A brand may want to keep the silhouette, change the inseam and waistband height, and use the original pocket only as a construction reference. That is far clearer than asking a factory to “make the same but better.” It also avoids accidental dependence on elements that should not be copied, including another company’s protected branding or proprietary design features. A reference garment should reduce ambiguity, not create a new layer of it.
What If the Specifications Are Incomplete?
Incomplete specifications are common and do not automatically make a project unworkable. The real problem appears when missing information is hidden inside vague instructions. A brand might know the silhouette and target use but still need help selecting fabric, or it might have a proven material but require fit adjustment. Another project may already have an approved product and only need the new manufacturer to interpret existing specifications correctly. These situations require different levels of engineering support, sourcing, and sampling.
Open decisions should be recorded as open decisions. Statements such as “fabric composition open to recommendation,” “waistband height to be confirmed after fitting,” or “logo method to be selected after wash evaluation” give the factory something concrete to manage. Once unknowns are visible, technical teams can separate straightforward OEM execution from development work and price the project accordingly. That makes the process more predictable for both sides and prevents a provisional assumption from quietly turning into an unintended bulk-production standard.
| Project Input | Useful Starting Detail | Manufacturing Value |
| Product type | Leggings, sports bra, running shorts, tracksuit | Identifies construction category |
| Intended use | Yoga, gym, running, tennis, lifestyle | Clarifies movement and performance needs |
| Technical reference | Tech Pack, sample, sketch, specification sheet | Establishes development starting point |
| Size range | XS-XL, S-2XL, or project-specific range | Supports pattern and grading review |
| Colors | Number of colorways and color references | Helps evaluate fabric and trim MOQ |
| Quantity | Units per design and preferably per color | Supports realistic costing |
| Branding | Logo method, labels, hangtags | Identifies artwork and process requirements |
| Target market | Selling region or customer standard | Flags labeling and testing questions |
| Delivery objective | Required launch or warehouse date | Supports production planning |
Which Product Specifications Does the Factory Need?

The factory needs specifications that make the garment measurable and repeatable: dimensions, measurement methods, fabric composition and weight, stretch expectations, construction, trims, colors, seam requirements, artwork placement, tolerances, and relevant performance criteria. A product image can communicate appearance, but technical specifications determine how the garment will be made, evaluated, and reproduced across sizes and production batches.
Which Measurements Define the Fit?
Sportswear fit is unusually sensitive to small dimensional changes because elastic fabrics interact with the body rather than simply hanging from it. A change at the waistband, underbust, rise, armhole, inseam, or leg opening can noticeably alter compression, mobility, and comfort. Measurement charts should therefore define actual Points of Measure instead of relying on broad terms such as “waist” or “length.” For leggings, common POMs include relaxed waist width, high hip, full hip, front rise, back rise, thigh, inseam, knee, leg opening, and waistband height. Sports bras may require underbust, front length, neckline depth, strap length, armhole, and bottom-band dimensions.
The measuring method must be controlled as carefully as the number itself. If one person measures the waistband along the top edge while another measures below the seam, both can report different values while believing they followed the same chart. Diagrams, flat-garment photos, and clearly named POMs reduce this risk. Many apparel projects use tolerances around ±0.5 to ±1.0 cm for selected finished-garment measurements, but this is only a common planning range; critical points may need tighter control and other points may allow more variation depending on fabric, seam construction, and the approved quality standard.
Which Fabric Details Should Be Specified?
Fiber composition alone does not define a sportswear fabric. Two fabrics labeled 75% nylon and 25% elastane can perform very differently because yarn type, knit structure, GSM, stretch direction, finishing, density, brushing, and recovery all change the wearing experience. A useful specification combines measurable properties with the intended feel: composition, approximate GSM, knit structure, surface appearance, stretch behavior, recovery, opacity expectation, compression target, and any performance requirement that needs testing or customer approval.
Brands should also separate mandatory requirements from characteristics that are open to sourcing. If a specific material is required to match an established product, the factory needs that exact reference or an approved equivalent standard. If the real goal is a smooth, opaque, high-recovery legging fabric, leaving the composition partially open can give the material team more options. Common planning ranges include roughly 120-180 GSM for lightweight running tops, 150-220 GSM for training T-shirts, 200-320 GSM for leggings and sports bra body fabrics, and 280-420 GSM for heavier athleisure. These ranges are not quality grades; actual suitability depends on structure, recovery, hand feel, and the finished garment design.
Which Trims and Construction Details Matter?
Small components often create large production differences. A sports bra may use bottom elastic, shoulder elastic, removable cups, binding, mesh, hook-and-eye closures, or adjustable hardware. Running shorts may combine drawcords, inner liners, zippers, bartacks, reflective applications, and pocket bags. Leggings may rely on elastic reinforcement, layered waistbands, flatlock seams, overlock assembly, or selected bonded edges. Each component affects sourcing, MOQ, sewing sequence, fit, and quality inspection, so “standard trim” is rarely specific enough for a final specification.
Construction terminology also needs care. A flat seam appearance is not automatically the same as four-needle six-thread flatlock, coverstitching, overlock assembly, bonded construction, or decorative topstitching. A process that works well on a stable double-knit fabric may behave poorly on a lightweight, highly elastic fabric. An experienced engineering team should therefore review whether the specified method fits the material and use case rather than simply following process names. Good specifications explain the desired outcome and the construction method, while leaving room for technical review when the proposed combination creates a manufacturing risk.
How Should Colors and Performance Requirements Be Defined?
Color should be controlled through a reproducible reference rather than a screen image alone. Screens, cameras, fabric texture, and lighting can shift perceived color significantly. Custom developments are normally easier to manage when the brand provides a recognized color reference, a physical swatch, or an approved lab dip. The approved standard should be traceable by code, version, or date so that material sourcing, sampling, and quality teams are working toward the same target.
Performance language requires even more discipline. Terms such as “high compression,” “squat-proof,” “quick-dry,” “chlorine-resistant,” or “waterproof” may imply specific material, construction, test, and acceptance requirements. A sample can look convincing and still fail the intended performance after stretching, washing, or repeated use. Brands should state what the claim means in the actual selling context and, when relevant, which test method or threshold will support it. A useful specification turns a subjective request into something that can be sourced, sampled, inspected, and verified rather than leaving the manufacturing team to interpret marketing language.
| Application | Common Planning Range | Key Evaluation Points |
| Lightweight running top | 120-180 GSM | Breathability, drying, drape |
| Training T-shirt | 150-220 GSM | Hand feel, recovery, durability |
| Leggings | 200-320 GSM | Stretch, recovery, opacity, compression |
| Sports bra body fabric | 200-320 GSM | Recovery, support, stability |
| Heavy athleisure | 280-420 GSM | Structure, warmth, drape |
What Branding Files Should a Brand Supply?

A brand should provide production-ready logo artwork, approved colors, dimensions, placement instructions, label files, hangtag information, packaging specifications, and any necessary intellectual-property authorization. Branding is not simply a request to “put the logo here.” The manufacturer needs enough information to reproduce the correct artwork with the right process, size, location, material, and version across garments and packaging.
Which Logo Files Does the Factory Need?
Vector artwork is usually the most useful production format because it can be resized without losing edge quality. AI, EPS, and editable PDF files are generally safer than a logo copied from a website or a small compressed JPG. The file should define the artwork cleanly, include the intended colors, and make it possible for the decoration supplier or in-house process team to separate elements correctly. If only a raster image exists, it should be high resolution and reviewed early enough that redraw work does not delay sampling.
The application method matters just as much as the artwork file. Heat transfer, embroidery, molded badges, silicone applications, screen-based processes, and other decoration methods have different limits for small lettering, gradients, line thickness, stretch, and wash durability. Highly elastic sportswear deserves particular attention because artwork can look perfect on a flat garment and distort dramatically under extension. The factory should therefore evaluate the logo on the intended fabric and garment area, not only on a computer screen, before the final branding specification is released.
How Should Logo Placement Be Defined?
“Logo on the left leg” is not a measurable instruction. Production teams need a defined reference point such as a waistband seam, side seam, pocket opening, center front, hem, or panel line. The specification should also clarify whether the measurement is taken to the artwork edge or artwork center. A useful instruction might define a 45 mm artwork width, place its center 80 mm below the waistband seam, and position it 35 mm from the side seam. That information can be checked during sampling and bulk inspection.
Placement should also be reviewed across the size range. Some brands keep one artwork size and one fixed relationship to a seam for all sizes; others adjust placement or scale to maintain visual proportion. Neither approach is automatically correct, but it should be deliberate. Many apparent “printing mistakes” are actually specification problems in which the artwork was technically applied correctly but nobody had defined exactly where it was supposed to sit. A placement drawing with measurable anchors is far more reliable than a screenshot with an arrow.
What Label Information Is Required?
Labels carry more production information than their small size suggests. A project may include a main brand label, size label, care label, fiber-content information, heat-transfer internal label, hangtag, barcode, SKU sticker, and carton identification. For each item, the manufacturer may need artwork, dimensions, material, fold type, color, attachment method, placement, language version, and approved revision. These details become especially important when the same style is packed for several markets or retail channels.
Care and content information should be reviewed carefully because labeling requirements can vary by destination market. A manufacturer can produce labels according to the approved file, but the brand should confirm the regulatory content expected in its selling region. Version control matters as well. Files named “final,” “final-new,” and “final-corrected” create unnecessary risk. A simple revision code, approval date, and clear status can prevent the wrong label from being attached to thousands of otherwise correct garments.
What Packaging Details Should Be Confirmed?
Packaging should be treated as part of the product specification, not as a decision postponed until bulk sewing is finished. The factory may need folding instructions, bag type and size, warning information where applicable, barcode position, size stickers, hangtag attachment, carton assortment, carton marks, quantity per carton, and any retailer-specific packing method. Special packaging can also introduce its own supplier minimums, lead times, and approval rounds, which means garment MOQ and packaging MOQ may not always align.
For larger programs, packaging complexity grows quickly. A single style in four colors and five sizes already creates twenty style-color-size combinations before destination-specific labels or carton ratios are considered. A clear packing matrix allows warehouse and quality teams to verify SKU, color, size, unit quantity, and carton allocation systematically. This is also where brand authorization can become relevant: when third-party trademarks, licensed graphics, sports-team marks, or other protected intellectual property are involved, the right to use those assets should be confirmed before sampling or production begins.
| Branding Element | Recommended Control | Common Failure |
| Logo artwork | Editable vector file | Pixelated edges or missing elements |
| Logo size | Width and height in mm | Inconsistent scale |
| Placement | Measured from a defined seam or POM | Position drift |
| Color | Approved color reference | Shade mismatch |
| Application | Confirmed process for actual fabric | Wrong decoration method |
| Label set | Artwork, dimensions, material, revision | Wrong language or obsolete file |
| Packaging | SKU-specific approved instruction | Sorting or labeling errors |
Which Order Details Are Needed for an Accurate Quote?

A reliable OEM quotation requires expected quantity, quantity by design and color, size range, material direction, construction details, branding, labels, packaging, target market, and timing assumptions. These inputs affect material consumption, supplier MOQ, setup, decoration, labor, inspection, packing, and scheduling. When major elements remain open, the quoted price should be understood as an estimate rather than a final production cost.
How Should Order Quantity Be Defined?
Total order quantity alone can hide the real manufacturing workload. Two thousand units of one legging style in one color are operationally very different from two thousand units split across eight styles, twelve colors, and several packaging versions. The second program requires more fabric lots, pattern and marker combinations, line changes, labels, cutting plans, packing controls, and approval points. For costing purposes, quantity is most useful when shown as design, then color, then size, even if the first size breakdown is only an estimate.
This structure allows the manufacturer to evaluate fabric requirements, custom-color feasibility, trim minimums, grading, label quantities, and packing ratios before the quote is treated as final. It also makes later revisions easier to understand. If a brand changes from two colors to six after receiving the quote, the commercial impact can be reviewed against a visible quantity plan rather than discussed as a vague “small change.” A clear matrix is one of the simplest ways to improve the accuracy of early sourcing conversations.
Do Colors and Sizes Affect MOQ?
Yes, but colors and sizes affect MOQ in different ways. Size count normally increases grading, cutting, bundling, labeling, and SKU complexity, while custom colors can directly affect fabric minimums because each dye lot may need to be produced separately. Custom elastic, zipper tape, molded components, printed packaging, and special transfers can introduce additional minimums of their own. A garment order that looks large in total can still contain individual color or component quantities that are commercially difficult to source.
This is why MOQ should be understood as a supply-chain condition rather than a single sales number. A 500-piece order in one available fabric and one color can be much easier to execute than 500 pieces divided among five custom colors and several unique trims. For Leadshow projects, the standard MOQ starts from 100 pieces per color per design, subject to fabric, trims, construction, and customization requirements. The condition matters: the garment MOQ cannot override a material or component supplier’s own minimum without a project-specific review.
Is a Target Price Helpful?
A realistic target price can be useful because it tells the manufacturer whether the current specification fits the brand’s commercial model. It is most valuable when the brand also identifies priorities. A team might say that the high-rise fit, side pocket, and opaque interlock fabric are mandatory, while a bonded hem and a particular internal label format are flexible. That gives the costing and engineering teams room to propose alternatives without weakening the product’s defining features.
A target price becomes less useful when it replaces the specification. Asking for a seven-dollar legging without defining fabric, construction, quantity, branding, or packaging encourages suppliers to quote different products under the same description. The lowest number may be based on lighter fabric, simpler seams, lower-cost elastic, reduced panel complexity, or basic packaging. Meaningful price comparison therefore requires both a target and a controlled technical baseline. Cost engineering works best when everyone is optimizing the same product rather than comparing different assumptions.
Which Market and Delivery Date Should Be Given?
Target market affects more than freight. Label content, performance claims, chemical requirements, packaging expectations, testing, and customer-specific standards may vary by selling region or retail program. The manufacturer does not need the brand’s entire go-to-market strategy, but it should know where the goods are intended to be sold and whether a retailer, marketplace, or distributor has additional requirements. That information helps technical and commercial teams identify questions early, before labels and packaging have already been ordered.
Delivery timing also needs a precise definition. “Need goods by September” might mean factory completion, cargo handover, warehouse arrival, or retail launch. Those milestones can be weeks apart. A workable schedule is built backward through material approval, sample approval, bulk fabric and trims, cutting, sewing, finishing, inspection, packing, and shipment. Leadshow’s combined monthly capacity can reach up to approximately 120,000 finished garments across three manufacturing bases, but actual availability depends on product construction, materials, order mix, quality requirements, and the current production schedule, so project timing still needs case-by-case review.
How Do Materials and Packaging Affect Cost?
Material cost is not simply the price per kilogram or meter. Fabric width influences marker efficiency, GSM affects consumption, stretch and curling influence spreading and cutting, and special surfaces can change sewing conditions. Custom dyeing may introduce color development, minimums, and additional approval work. A fabric that is slightly cheaper per unit can still increase the finished garment cost if it creates poor yield or more difficult production handling. The manufacturer therefore needs enough information to evaluate total material behavior, not only a supplier price.
Packaging works the same way on a smaller scale. Standard clear bags and simple carton assortments are operationally different from custom printed bags, tissue, retail boxes, branded hangtags, barcode labels, or destination-specific carton marks. These decisions accumulate. A garment with custom fabric, custom elastic, heat-transfer branding, care labels, hangtags, SKU stickers, branded bags, and special cartons becomes a coordinated supply chain of multiple parts and approvals. Accurate quotation depends on understanding that whole package before the price is locked.
| Quotation Input | Why It Matters | Risk if Missing |
| Quantity per design | Defines production scale | Misleading unit price |
| Quantity per color | Affects fabric and trim MOQ | Unexpected surcharges or substitutions |
| Size range | Affects grading and SKU handling | Incomplete costing |
| Fabric | Major consumption and feasibility driver | Quote changes after sampling |
| Construction | Determines labor and machinery needs | Underestimated operation time |
| Logo process | Adds setup and application cost | Decoration cost changes |
| Packaging | Adds materials and handling | Late packing cost |
| Target market | Helps identify compliance questions | Label or test revisions |
| Required date | Supports scheduling review | Unrealistic lead-time expectation |
How Should a Brand Prepare for Sampling and Production?

A brand should define what each sample is meant to prove, submit measurable fit comments, control revisions, and establish which approved sample and document set will govern bulk production. Before production, key materials, fit, measurements, construction, artwork, labels, packaging, and quality requirements should have a clear approval status so that the factory is reproducing decisions rather than continuing development on the production line.
What Should the First Sample Prove?
The first sample should answer the most important questions for that stage of development. A prototype may focus on silhouette, pattern balance, pocket position, and basic construction, and it may use substitute material if the intended bulk fabric is not yet available. A later fit sample can concentrate on measurements, movement, and wearing comfort, while a pre-production reference should usually be much closer to the approved bulk version in material, trim, branding, and workmanship. The sample name matters less than an agreed understanding of what is actually being evaluated.
Problems arise when the brand and factory expect different proof from the same garment. Before sampling starts, both sides should identify sample type, sample size, fabric status, color status, branding status, key review points, and which items are provisional. Leadshow’s development framework supports technical review, pattern development, sample coordination, fit adjustment, material and workmanship evaluation, and production conversion, but a substitute-material sample or a base-size approval does not automatically approve every material, color, size, or bulk-production detail. Approval scope should always be explicit.
How Should Fit Comments Be Submitted?
Fit comments work best when they combine wearer observation with a measurable action. “The waist feels too loose” is useful because it describes the experience, while “reduce the relaxed top-waist width by 1 cm” gives the pattern team an instruction that can be implemented and checked. Front, side, and back fitting photographs can add context for issues such as drag lines, pocket gaping, waistband rolling, neckline position, seam twisting, or excess fabric that may not be obvious from measurements alone.
Brands should also distinguish between a defect and a design revision. If the sample fails to meet an approved measurement, that is a conformity issue. If the sample meets the Tech Pack but the brand decides the neckline should be higher after trying it on, that is a design change. Both matter, but they should not be recorded in the same way. Consolidating comments into one controlled file is also important; five separate email chains can easily produce contradictory instructions that delay a revision rather than improving it.
Which Details Must Be Approved Before Bulk?
Bulk production should not depend on unresolved assumptions. Depending on the style, approval may include fabric quality, color, base-size fit, finished measurements, grading, construction, seam methods, trims, elastic, logo application, artwork placement, labels, hangtags, packaging, and quality criteria. The team should know which reference controls each feature before cutting begins. An approved physical sample may control appearance, while a measurement chart controls dimensions and an approved fabric swatch controls material and shade.
Approval also needs boundaries. A photo approval does not automatically confirm every garment measurement. Approval of one base size does not prove that all graded sizes fit correctly. A prototype made in substitute fabric does not approve the final bulk material. These distinctions are especially important in sportswear because fabric recovery and stretch can change fit even when nominal measurements remain similar. The closer the approved reference is to the intended production version, the lower the risk that development decisions continue after bulk materials have already been committed.
What Quality Requirements Should Be Defined?
“Premium quality” cannot be inspected consistently, so brands should translate quality expectations into controls that production and QC teams can actually observe, measure, compare, or test. Measurements need defined POMs and tolerances. Workmanship may require clear seam appearance, reinforcement locations, acceptable thread finishing, and defect criteria. Branding should have approved artwork size and placement. Packaging should specify the correct SKU, label, folding method, and carton arrangement. The objective is to create a common reference rather than rely on subjective judgment at final inspection.
Product-specific risks should influence the quality plan. Leggings may need particular attention to waistband stability, opacity, seam recovery, crotch construction, and stretch appearance. Sports bras may require close review of underbust fit, strap geometry, elastic application, cup position, and seam stability. Running shorts can place more emphasis on liner construction, pocket security, drawcord behavior, and reinforcement at stress points. Where performance claims matter, the brand should also define the applicable test method or acceptance requirement instead of assuming a visual sample proves long-term performance.
How Are Approved Specifications Controlled?
Version control becomes more important with every sampling round. A typical project can quickly accumulate multiple Tech Packs, measurement charts, artwork files, packaging revisions, comments, and material approvals. If production teams receive different versions, each document may appear reasonable on its own while the combined instructions contradict one another. A controlled production package should therefore use clear revision numbers or dates, identify current approval status, and remove superseded files from active circulation.
The hierarchy between references should also be understood. The approved physical sample might control general appearance, the measurement chart may control dimensions, the approved material swatch may control fabric quality and color, and the final artwork file may control logo detail. Any change after approval should be recorded rather than passed only through an isolated message. This discipline becomes even more valuable on repeat orders because the manufacturer can compare new requests against a stable baseline instead of rebuilding product knowledge from memory each season.
| Approval Area | Practical Control | Typical Evidence |
| Measurements | POM plus tolerance | Measurement report |
| Fit | Approved sample and consolidated comments | Fit approval record |
| Fabric | Approved quality and color | Swatch or material approval |
| Construction | Defined seam and assembly details | Tech Pack and sample |
| Logo | Artwork size and placement | Artwork approval |
| Labels | Correct file, version, and location | Approved label file |
| Packaging | SKU and packing instruction | Packing specification |
| Performance | Project-specific criteria | Test result where required |
A strong OEM relationship starts when both sides can answer the same practical questions: What exactly are we making? Which specifications are fixed? Which items still need development? What has been approved? What quantity is commercially realistic? Which sample, document, material, and artwork files control the final version? When those answers are visible, quotation and sampling become faster to evaluate, fit comments become easier to implement, and bulk production is less likely to inherit unresolved development decisions.
Shenzhen Leadshow Sports Technology Co., Ltd. supports OEM and ODM apparel projects across sportswear, swimwear, streetwear, and modest sportswear. Its current confirmed manufacturing profile includes 15 years of industry experience, three manufacturing bases with more than 20,000 square meters of combined factory area, a team of more than 1,500 employees, and combined monthly capacity of up to approximately 120,000 finished garments subject to product construction, materials, order mix, quality requirements, and current scheduling. Standard MOQ starts from 100 pieces per color per design, subject to fabric, trims, construction, and customization requirements.
If you are preparing a sports bra, yoga legging, running short, sports T-shirt, tank top, tracksuit, hoodie, sweatshirt, tennis skirt, jumpsuit, or another product within the confirmed range, send your strongest available project information for review. A Tech Pack, BOM, measurement chart, physical reference sample, artwork files, quantity by color and size, target market, and packaging requirements give the technical and commercial teams the clearest starting point. Where information is still open, identify those decisions directly so the project can be evaluated as development work rather than forced into a quotation built on assumptions.
| Useful files to send | Tech Pack, BOM, measurement chart, physical sample or clear reference, artwork, quantity by design/color/size, target market, packaging requirements, and a list of any open decisions. |


