A sportswear quotation can look wonderfully simple: a product description, quantity, unit price, lead-time estimate, and a few commercial terms. The manufacturing reality behind that number is much more complicated. A factory quoting slightly less per garment can still become the more expensive supplier when samples need repeated correction, material assumptions change after quotation, measurements drift in bulk, approvals are poorly controlled, or production dates were promised before materials and capacity were actually secured. Mature sourcing teams therefore compare factories as production systems, not merely as price lists.
| Brands should score sportswear manufacturers with a weighted, evidence-based scorecard covering product quality, development capability, sample-to-bulk control, capacity, delivery planning, communication, compliance, risk management, and total sourcing value. Unit price should remain part of the decision, but it should not outweigh manufacturing risks that can create defects, rework, delays, premium freight, or failed launches. |
Consider two factories quoting the same yoga legging. The first is cheaper and immediately confirms the order can be made. The second asks about fabric stretch and recovery, waistband construction, logo method, measurement tolerances, size range, packing requirements, and the exact version that will control bulk production. At first glance, the second supplier may seem slower or more expensive. Once sampling, production, and delivery begin, however, those questions often determine which quotation was genuinely safer and which one merely looked cheaper on day one.
What Should a Sportswear Manufacturer Scorecard Measure?
| A sportswear manufacturer scorecard should measure the factors that determine whether a supplier can turn an approved specification into repeatable bulk production. Core areas include product quality, development capability, sample-to-bulk control, capacity, delivery planning, communication, compliance, risk management, and total commercial value. Unit price belongs in the model, but it should never compensate for unresolved manufacturing risk. |

A scorecard becomes useful when it replaces vague impressions with comparable evidence. Descriptions such as good quality, fast reply, competitive price, or strong factory are too subjective for a serious sourcing decision because different team members can interpret them differently. A more reliable approach defines what is being scored, what evidence is expected, how much the factor matters to the project, and what an acceptable or unacceptable result looks like. The scorecard then becomes a practical decision tool rather than a collection of favorable adjectives.
Sportswear also requires the scoring model to reflect product risk. A straightforward sports T-shirt does not create the same development burden as a fitted sports bra, bonded running short, yoga legging, or multi-panel jumpsuit using high-stretch fabric. Construction, stretch recovery, elastic tension, fit, grading, logo application, testing, and packing may all change the risk profile. The weighting should therefore respond to the garment and market rather than staying identical for every project.
| Evaluation Area | Example Weight | Evidence to Review | Strong Signal |
| Product Quality | 25% | Samples, measurements, workmanship, inspection evidence | Approved requirements can be reproduced consistently |
| Development Capability | 20% | Tech Pack review, pattern work, sample revisions | Technical gaps are identified before production |
| Capacity & Delivery | 20% | Material readiness, schedule, SKU plan | Timing is linked to approvals, materials and available capacity |
| Communication & Risk Control | 15% | Written clarifications, change records, issue handling | Risks are raised early with practical options |
| Compliance & Testing | 10% | Applicable test requirements and document scope | Evidence matches the product and target market |
| Commercial Value | 10% | Quote scope, assumptions, cost changes | Price is transparent and comparable on equal scope |
The percentages above are an illustrative framework, not an industry rule. Their value is in forcing the sourcing team to discuss priorities before a supplier is chosen. A high-risk seasonal product may require more weight on delivery planning, while a performance-led garment may require more emphasis on material behavior, testing, and sample-to-bulk repeatability. A good scorecard is therefore stable enough to compare suppliers but flexible enough to reflect the commercial consequences of failure in the actual program.
Which Criteria Deserve the Most Weight?
The highest weight should go to factors whose failure would have the greatest commercial consequence. For a technically demanding activewear program, quality and development capability often deserve significant attention because an error in fit, fabric selection, seam construction, or stretch behavior can affect every unit in the order. For a seasonal launch, production planning and delivery reliability may carry more weight because missing a selling window can be more damaging than paying a slightly higher unit price. Compliance can even become a pass-or-hold criterion when specific testing or documentation is mandatory for the target market.
How Should Brands Use a Weighted Score?
A 1-to-5 scale is usually sufficient when each number has a clear definition. A score of 5 can indicate that the requirement is understood, relevant evidence has been reviewed, execution has been demonstrated, and remaining conditions are documented. A score of 3 can mean acceptable capability with open points that still require confirmation, while a score of 1 can represent material uncertainty or missing evidence. Weighted scoring is useful because it prevents a low-risk strength, such as quick communication, from masking a critical technical weakness that could stop production.
What Does a Good Score Look Like?
A good score is one that predicts execution reasonably well, not simply the highest percentage in the spreadsheet. Two manufacturers may both reach 82 out of 100 while carrying very different risks. One may be technically strong but weak in delivery planning, while another communicates well but lacks clear evidence of sample-to-bulk control. The sourcing team should therefore examine category-level weaknesses and any critical gate conditions alongside the total. The shape of the score matters because one severe weakness can be more important than several moderate strengths.
Which Evidence Should Support Each Score?
Every important score should be traceable to evidence. For development, that may include Tech Pack comments, sample measurements, fit revisions, approved materials, construction notes, and revision records. For production, evidence may include material readiness, SKU breakdowns, approved production references, inspection requirements, packing instructions, and documented changes. Testing evidence should identify what was tested and under which method or scope. A manufacturer is more credible when it distinguishes confirmed facts from project-dependent conditions instead of presenting every capability as universally applicable.
How Should Brands Score Quality and Development Capability?
| Brands should score quality and development capability by evaluating how accurately a manufacturer converts specifications into a production-ready garment. Review Tech Pack understanding, material interpretation, pattern and fit work, sample accuracy, revision control, workmanship, measurements, and production-version approval. A strong sample matters, but the more valuable indicator is whether the supplier can reproduce the approved result consistently in bulk. |

One of the most common sourcing mistakes is to score sample appearance too heavily. A development sample may be produced by an experienced sample maker under close supervision, while bulk manufacturing introduces more operators, more sizes, more colors, different material lots, tighter timing, and additional handling. The stronger question is not simply whether one attractive sample can be made, but whether the factory can define the approved construction and translate it into repeatable production instructions without losing critical decisions along the way.
This distinction matters in activewear because fitted products depend on the interaction between fabric, pattern, elastic structures, seams, and intended use. A small change in fabric recovery, waistband construction, seam allowance, or elastic tension can alter fit even if the garment looks visually similar. Development capability should therefore be judged by the supplier’s ability to identify technical dependencies, control revisions, and explain what still requires confirmation before the garment becomes suitable for bulk production.
| Quality / Development Check | What to Verify | Useful Evidence | Risk Indicator |
| Tech Pack Understanding | Measurements, construction, materials, trims | Written technical review and clarified assumptions | Quotation or sampling begins with unresolved specifications |
| Pattern & Fit | Shape, balance, measurements, grading logic | Fit sample and measurement comparison | Approved areas change unintentionally during revisions |
| Material Interpretation | Composition, weight, stretch, recovery, finish | Swatches, specifications, applicable tests | Material is selected mainly by appearance or price |
| Workmanship | Seam type, reinforcement, finishing | Physical sample and construction review | Different techniques appear between revisions |
| Branding | Method, size, placement, durability need | Artwork and application sample | Logo details are confirmed only verbally |
| Production Version | Approved pattern, materials, trims, packaging | Controlled production reference | Multiple conflicting versions remain active |
The table should be used as an evaluation framework rather than a universal acceptance standard. For example, not every garment requires the same performance test, and not every development project needs a full size-set sample before the next stage. The sourcing team should first define which characteristics are critical for the product, then judge whether the supplier has an appropriate development path and sufficient evidence to control those characteristics through sampling and production.
How Well Does the Factory Understand the Product?
A capable manufacturer should do more than confirm that a garment can be made. The technical team should identify which requirements are already clear and which still need clarification. A reference image showing a seamless-looking waistband, for example, does not explain whether the structure is folded, bonded, elasticated, or achieved through another construction method. The decision affects pattern development, machinery, cost, testing, and bulk repeatability. The same applies to fabrics: a broad composition such as nylon-spandex does not define weight, stretch direction, recovery, surface finish, opacity, or dimensional behavior.
What Should Sampling Reveal?
Sampling should expose the assumptions that would otherwise remain hidden until bulk production. Each round can be used to check measurements, fit, material behavior, elastic tension, seam comfort, pocket construction, logo placement, trims, and whether comments have been applied accurately. Revision performance is particularly revealing because it shows whether the supplier can correct one requested area without unintentionally changing approved details elsewhere. A substitute-material sample may be useful for construction review, but it should not be confused with confirmation of final bulk fabric, and approval of one size should not automatically confirm the complete size range.
How Is Sample-to-Bulk Control Evaluated?
Sample-to-bulk control begins with one practical question: what exactly is the approved production reference? Before bulk cutting, the active pattern, measurement specification, fabric, trim, color, branding method, label, packaging requirement, and approval status should be clear. When changes occur, superseded versions should not remain available as competing instructions. Many quality failures are not caused by poor sewing ability; they happen because the correct decision existed somewhere in development, but production used an older or incomplete version. Clear approval boundaries and version control deserve meaningful weight in the scorecard.
Which Sportswear Risks Need Extra Attention?
Sportswear should be evaluated according to the product’s actual function rather than a generic checklist. Depending on the garment, relevant checks may include dimensional stability, colorfastness, pilling and abrasion, stretch and recovery, seam or bursting performance, logo wash durability, trim attachment, water repellency, UPF, or chlorine resistance. The important point is scope: a result from one tested material does not automatically apply to another color, batch, construction, or finished garment. Performance claims should be tied to the applicable design, material, use case, and test evidence rather than treated as universal factory promises.
How Should Brands Score Capacity and Delivery Reliability?
| Brands should score capacity and delivery reliability by checking whether production timing is based on product complexity, material readiness, SKU mix, approvals, and current scheduling. A headline monthly-capacity figure is useful background, but the stronger evidence is whether the manufacturer can explain how the specific order fits into available production and which conditions must be completed before dates become firm. |

Capacity is often oversimplified during RFQ comparison. Sourcing teams ask for monthly output, suppliers provide a large number, and that number is then treated as evidence that a specific order can be delivered on time. In practice, capacity depends on the production route. A factory capable of producing large volumes of basic garments may have more limited availability for complex activewear using bonding, flat seams, laser perforation, specialist elastics, several logo processes, or fabrics that require careful handling before cutting.
SKU complexity adds another layer. One design in one or two colors can move through cutting, sewing, inspection, labeling, and packing very differently from the same total quantity divided across several designs, colors, and sizes. A five-color style with six sizes already creates 30 theoretical SKU combinations. That does not automatically make the order difficult, but it increases the need for accurate allocation, material separation, labels, size checks, packing ratios, and final shipment verification.
| Capacity / Delivery Factor | Simpler Order Example | More Complex Order Example | Planning Impact |
| Styles | 1 design | 4-8 designs | More setup and production changeovers |
| Colors | 1-2 colors | 5 or more colors | More material separation and cutting control |
| Sizes | 4 sizes | 6-8 sizes | More allocation and measurement checkpoints |
| SKU Count | 8 SKUs | 30+ SKUs | More sorting, labels, packing and mismatch risk |
| Processes | Standard sewing | Flatlock, bonding, printing, special trims | Additional routing, validation and scheduling |
| Approval Status | Final reference approved | Several requirements still open | Schedule remains provisional until approvals close |
These figures are examples that illustrate operational complexity rather than fixed thresholds. The same number of SKUs can be easy or difficult depending on the materials, construction, packing method, and production sequence. The useful sourcing question is whether the manufacturer recognizes the actual workload created by the order and can translate that workload into a realistic plan. Capacity should therefore be judged by project-level planning quality, not only by facility size or a published monthly output number.
Is the Factory Capacity Suitable for the Order?
Capacity should always be evaluated against the real product. A more useful question than asking for monthly output is to ask how much capacity is realistically available for the planned garment, material, construction, SKU mix, and delivery target. For Leadshow, the three manufacturing bases provide combined monthly capacity of up to approximately 120,000 finished garments, but that figure is expressly dependent on product construction, materials, processes, order mix, and current production scheduling. That qualification makes the capacity figure more useful because it recognizes that different garments consume different resources and cannot be reduced to a single fixed output assumption.
How Does the Factory Plan Production?
A credible production plan begins before sewing. Fabric needs to be available and suitable for cutting, trims and branding materials must be ready, patterns and specifications should be approved, and specialized processes may require separate equipment or supplier coordination. Multi-style, multi-color, and multi-size orders also increase purchasing batches, cutting and sorting work, production changes, labels, inspection points, SKU management, packing complexity, and mismatch risk. Suppliers should therefore be scored on whether the plan reflects these dependencies rather than calculating delivery only from total quantity divided by a nominal daily output.
Are Lead Times Realistic?
A realistic delivery promise distinguishes milestones rather than collapsing them into one date. Sample completion is not sample receipt, production completion is not shipment departure, and shipment departure is not final warehouse arrival. A useful schedule can separate pattern development, sample revisions, material lead time, testing where required, customer approval, production release, goods-ready date, pickup, estimated departure, and estimated arrival. Leadshow’s documented timing approach treats sample and bulk timing as dependent on specifications, materials, revision rounds, workmanship, quantity, approvals, payment, and current scheduling, with goods-ready, shipment, and arrival handled as separate milestones.
How Does the Factory Handle Changes?
Changes should trigger reassessment rather than silent acceptance. If the brand changes fabric, adds colors, modifies the logo process, increases the size range, or delays an approval, the original cost and schedule assumptions may no longer describe the same project. A disciplined manufacturer should identify whether the change affects sampling, material purchasing, testing, production allocation, or shipment timing. A useful scorecard therefore asks whether the supplier updates the plan when the project changes. Preliminary schedules, reserved capacity, confirmed production schedules, actual production starts, estimated completion dates, and confirmed shipment dates should be treated as different stages rather than interchangeable promises.
How Should Brands Score Communication and Risk Control?
| Brands should score communication by measuring clarity, accuracy, risk awareness, and follow-through rather than reply speed alone. Strong manufacturers identify missing information, document assumptions, raise risks before they affect production, control revisions, and explain corrective actions. Good communication does not remove manufacturing risk, but it makes that risk visible early enough for the sourcing team to make better decisions. |

Fast communication is useful, but speed by itself is a weak quality metric. A reply that says OK, can do within ten minutes may provide less value than a response that takes longer but identifies a construction conflict, missing specification, material lead-time issue, or unconfirmed testing requirement. For complex apparel programs, communication is part of production control because decisions made in email, messaging applications, sample comments, revised files, and meetings eventually affect materials, patterns, sewing instructions, branding, inspection, labels, packing, and shipment preparation.
The strongest suppliers make those decisions easier to trace. They state which product version is being discussed, what remains provisional, which assumption affects the quotation, and what action is required next. This does not mean every conversation needs to become formal paperwork. It means commercially important decisions should not remain ambiguous. A sourcing team can then distinguish a real manufacturing risk from a simple communication delay and can assess the supplier’s response based on how effectively the issue was controlled.
| Communication / Risk Area | Good Practice | Useful Question | Warning Sign |
| RFQ Clarification | Missing specifications and assumptions are identified | Which assumptions are included in this quote? | Immediate price with unclear scope |
| Technical Communication | Issue, cause and consequence are explained | Which specification or component is affected? | Vague production problem messages |
| Change Control | Current version and approval scope are recorded | Which file controls the production version? | Conflicting files remain active |
| Risk Escalation | Material or timing risks are raised early | What could affect the target date? | Problem appears only after a milestone is missed |
| Compliance Communication | Document scope is explained | Which material, color, batch or product does this cover? | Generic evidence is applied to every product |
The table focuses on behaviors that can be observed during real projects. It does not require a manufacturer to have sophisticated software or a large digital portal. Clear communication can still be achieved through controlled documents, written confirmations, sample comments, and disciplined follow-up. The scoring question is whether information stays accurate and actionable as the project changes. A supplier with fewer digital tools but better change discipline may be safer than a supplier with an impressive interface and weak control of the actual garment requirements.
Does the Factory Communicate Clearly?
Clear communication is specific enough to support a decision. If a fabric is unavailable, the sourcing team should understand whether the problem is color, composition, weight, supplier MOQ, lead time, or another constraint. If the unit price changes, the reason should be visible, whether it comes from quantity, fabric, trims, logo process, packaging, or another specification update. Leadshow’s project review process assesses product, quantity, MOQ, Tech Pack or reference sample, materials, workmanship, destination market, budget, target timing, packaging, testing, and other applicable conditions before the project advances through technical review, costing, quotation, sampling, and order confirmation.
Does the Factory Raise Risks Early?
The best time to discover a manufacturing problem is before material is cut. A selected fabric may have a long lead time, a custom elastic may require a supplier MOQ above the planned order, a bonded seam may need validation on the final material, or the requested delivery window may conflict with material readiness. A manufacturer should not be penalized merely for identifying these risks. In many cases, early risk transparency should improve the score when the supplier explains the consequence and proposes realistic alternatives. A controlled subject-to-testing response is often safer than an unsupported guarantee.
How Are Changes Documented?
Version control deserves its own score because apparel development produces a large number of changing files and decisions. Measurements may change after fit review, artwork may be resized, fabrics can be substituted, label information may be updated, and packing ratios can shift. Every major change should answer what changed, which version replaces the old one, and whether the update affects price, timing, testing, or production approval. The same discipline matters for repeat orders, where patterns, materials, colors, trims, logos, labels, packaging, testing, target market, price, and current scheduling may all need reconfirmation rather than being assumed identical to the previous order.
Which Compliance Evidence Should Be Checked?
Compliance evidence should be evaluated for relevance rather than volume. A folder containing many reports may look impressive, but the sourcing team still needs to know what each document covers, which test method was used, whether it applies to the manufacturer or a material supplier, and whether the tested sample matches the current material, color, batch, or finished garment. Leadshow can coordinate project-based material, garment, performance, and chemical testing while reviewing the applicable sample, method, color, batch, and report scope. This type of scope control is more meaningful than a broad statement that every product is universally compliant.
How Do Brands Compare Total Value Beyond Unit Price?
| Brands should compare total value by first making sure every manufacturer is pricing the same scope, then considering the cost of execution risk. Compare fabrics, trims, branding, labels, packaging, testing, quantities, approvals, and delivery assumptions before comparing unit prices. Rework, extra sampling, delays, premium freight, and internal management time can make a lower quotation more expensive in practice. |

Unit price still matters. The mistake is treating it as if it describes the entire sourcing cost. A quotation is the result of assumptions about fabric quality, material MOQ, trims, construction, branding method, size range, quantity, packaging, testing, approvals, and delivery conditions. When two manufacturers use different assumptions, their prices are not directly comparable even if the garment name is the same. Before scoring commercial value, the sourcing team should normalize the scope and make any remaining uncertainty visible.
Price can appear more precise than the rest of the sourcing decision because it arrives as a number with decimal places. One supplier may quote 8.40 and another 8.80, creating an obvious difference of 0.40 per unit. Yet the lower quotation may use a different fabric assumption, exclude a packaging component, rely on an unconfirmed trim, or assume fewer development steps. The apparent precision can therefore hide a larger uncertainty. A well-structured scorecard keeps price important while preventing it from overwhelming factors that determine whether the quoted scope is actually deliverable.
| Cost / Scope Item | What Must Be Equalized | Potential Hidden Cost | Sourcing Value |
| Fabric | Composition, weight, stretch, finish, color | Re-costing, fit changes, performance differences | High |
| Trims | Elastic, zipper, drawcord, hardware | MOQ differences, substitution, delay | Medium-High |
| Branding | Logo method, size, colors, placement | Setup changes and application cost | Medium |
| Quantity & Sizes | Units per design/color and size matrix | Different price breaks, grading and packing complexity | High |
| Labels & Packaging | Required labels, bags, cartons, barcodes, inserts | Relabeling, repacking, warehouse errors | Medium-High |
| Testing & Delivery | Test responsibility and delivery milestone | Unexpected test cost, rework, premium freight | High where applicable |
The purpose of normalizing scope is not to make every quotation perfectly identical before development begins. That is rarely realistic. Instead, it helps the sourcing team identify which parts are genuinely comparable and which remain provisional. A transparent quotation that lists assumptions can be easier to manage than a lower price that appears final while important inputs remain open. The commercial score should therefore reward clarity around what is included, what can change, and which project decisions are still required before the final manufacturing cost is stable.
What Costs Sit Outside the Unit Price?
Several costs may never appear in the original unit-price comparison. Sample revisions consume development time, delayed materials can move launch dates, incorrect labels may require repacking, measurement problems can trigger sorting or rework, and weak inspection can allow defects into final packing. A late production release can also force a faster and more expensive freight option. There is internal cost as well: every unclear supplier decision consumes time from merchandising, development, quality, logistics, and management teams. These risks do not always need an exact dollar value, but their likelihood and commercial impact should be recognized in the sourcing decision.
Is the Quote Based on the Same Scope?
Price comparison should begin with an input checklist. Useful information includes product category, Tech Pack or reference images, quantity per design and color, size range, fabric requirements, trim requirements, logo method, labels, packaging, testing requirements, target market, and target date. Leadshow uses these categories as the basis for reviewing custom apparel inquiries, with standard MOQ generally starting from 100 pieces per color per design and final conditions remaining dependent on product, material, branding, packaging, testing, and production requirements. If information is incomplete, the quotation can still be useful, but its provisional assumptions should be visible.
Which Risks Can Make a Low Quote Expensive?
Low pricing becomes risky when the saving depends on assumptions the sourcing team has not noticed. Common examples include cheaper substitute materials, simplified construction, excluded packaging, unconfirmed custom trims, reduced testing, or optimistic timing. Another hidden cost is development instability: if a low quote requires repeated sample rounds before the product becomes production-ready, the extra development work and delayed launch may outweigh the original saving. A high price is not evidence of quality either. The fair comparison is clearly defined scope versus unclear scope, verified capability versus unsupported claims, and manageable risk versus hidden risk.
How Should Scores Affect Supplier Selection?
The scorecard should lead to a sourcing action rather than a ranking for its own sake. A technically strong manufacturer with one documentation gap may remain on the shortlist while additional evidence is requested. A promising new supplier may move to controlled sampling before receiving a bulk order. A supplier with good historical performance in basic knitwear but limited evidence for bonded activewear may still be retained for the products it handles well. The goal is to allocate business according to demonstrated fit, not to force every manufacturer into a single best-to-worst list.
| Score Pattern | Practical Next Step | Reason |
| Strong across critical areas | Proceed to sampling or controlled order review | Evidence and project fit are broadly aligned |
| Strong technical capability, incomplete documentation | Request missing evidence before final approval | Gap may be resolvable without changing supplier fit |
| Good price, weak development evidence | Test through sampling before commitment | Low price does not confirm technical execution |
| Strong history, new product category | Run category-specific development evaluation | Past performance may not transfer automatically |
| Good overall score, critical compliance gap | Hold decision until requirement is resolved | Gate risk should not be averaged away |
| Low price, several unresolved risks | Re-scope quote or remove from shortlist | Commercial saving may not justify execution exposure |
The manufacturer that ultimately moves forward should provide the strongest combination of technical fit, repeatable quality, realistic delivery planning, communication discipline, applicable compliance evidence, and acceptable commercial value. For projects evaluated with Leadshow, confirmed company information includes 15 years of industry experience, three manufacturing bases, more than 20,000 square meters of combined facilities, a team of more than 1,500 people, and 304 production and finishing machines. Combined monthly capacity can reach up to approximately 120,000 finished garments depending on product complexity, materials, order mix, and production scheduling.
Manufacturing resources cover fabric preparation, spreading, cutting, lockstitch, overlock, double-needle sewing, bartacking, four-needle six-thread sewing, bonding, seam taping, laser perforation, heat transfer, pressing, needle detection, folding, and packing, with suitability reviewed according to the garment, material, construction, and testing requirements. These capabilities should still be connected to the actual project rather than treated as universal guarantees. That is the central point of scoring manufacturers beyond unit price: the quotation becomes more credible when the underlying assumptions, evidence, and production conditions are visible.
If you are developing custom sports bras, sports T-shirts, yoga leggings, tennis skirts, jumpsuits, running shorts, tank tops, tracksuits, hoodies, or sweatshirts, you can submit a Tech Pack, reference images, or a reference sample together with the quantity per design and color, size range, fabric and trim requirements, logo method, labels, packaging, testing requirements, target market, and target date. Shenzhen Leadshow can review product feasibility, materials, sampling requirements, manufacturing conditions, labeling and packaging needs, and project timing before developing a project-based quotation that reflects the confirmed scope.
A strong sourcing decision should make the final price easier to understand rather than allowing one attractive number to hide every other manufacturing question. When the product scope, development status, production version, testing needs, timing assumptions, and packing requirements are visible, unit price becomes a meaningful commercial comparison instead of a shortcut. Brands that evaluate suppliers this way are better positioned to choose a manufacturing partner whose quotation is supported by the work required to deliver the product, not merely by the lowest figure on the first spreadsheet.